净化生产车间工程施工方案
第一章 综合报告······································1
1.1概述···············································1
1.2关键技术简介·······································1
第二章 净化工程的设计验证····························9
2.6对工艺管道专业的要求······························11
2.7对建筑装饰专业的要求······························12
2.8对净化空调专业的要求······························13
2.9对给水排水专业的要求······························14
2.10对电气专业的要求·································14
第三章 关键技术·····································17
3.1洁净室建筑装饰施工技术····························17
3.2地面装饰施工技术··································31
3.3净化风管施工技术·································39
3.4用水设备及其输送管道安装技术·····················55
3.5洁净室综合效能调试技术···························68
第四章 一般施工技术································88
4.2通风空调施工技术·································89
4.3给排水施工技术···································92
4.4工艺管道施工技术·································98
4.5电气安装施工技术·································105
4.6设备安装技术·····································107
4.7保温施工技术·····································111
第五章 净化工程的施工管理··························115
5.1施工项目经理部的建立·····························115
5.2施工质量、安全管理·······························115
5.3现场文明施工、环境保护···························119
5.4工程验收·········································122
第六章 施工组织设计································115
6.1现场组织机构及劳动力计划·························115
6.2施工机具表·······································115
6.3工程进度表·······································119
6.4施工布置·········································122